Access the Full Project by Clicking here!
Bidjugde
JOB
Drainage Basin 15 Improvements Phase 1A NW 52nd Street Culvert Replacement
BID DATE
12/12/25 - 12:00
AGENCY
Sunrise
ESTIMATE
n/a
SCOPE
The Work for this project consists of, but is not limited to, sediment and turbidity control, pollution prevention, clearing and grubbing, maintenance of traffic, canal bypass pumping, temporary steel sheet piling, dewatering, demolition and replacement of existing canal culvert pipe, street drainage pipe and structures, demolition and restoration of pavement, curb and sidewalk, shaping and excavation and grading of the existing canals banks, construction of concrete end walls, construction of filter point grout mat, relocation of existing water main pipe, replacement of existing PVC gravity sewer main piping with ductile iron pipe, cutting into and connecting to existing street drainage pipe and canal culvert pipes, pavement milling and resurfacing, pavement markings, sodding and other miscellaneous and incidental items to provide a complete project as specified in the Contract Documents. https://www.demandstar.com/app/limited/bids/514120/details

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT