Access the Full Project by Clicking here!
Bidjugde
JOB
South Penelope North Main Street Industrial Park Road Sidewalk Improvements Belton
BID DATE
11/25/25 - 8:00
AGENCY
Belton
ESTIMATE
n/a
SCOPE
For South Penelope Street, the project includes, but is not limited to, protection of items to remain, the demolition of existing asphalt and concrete paving. The scope also includes new sidewalk paving, installation of concrete curb and gutter, ADA-compliant ramps, and handrails.The utility scope includes adjustments to water meter vaults, cleanouts, and other utility structures to match the proposed sidewalk grade. The storm sewer scope involves connecting existing downspouts to a new underground collection pipe that ties into the existing drainage system. The project also includes sidewalk closures and pedestrian access phasing plans. Work at the Penelope Street location cannot begin until after January 3, 2026 and shall be complete by July 1, 2026. Two sections of Penelope Street will have sidewalk alternates 1 and 2. For Main Street, this project includes, but is not limited to, protection of items to remain, the demolition of existing asphalt and concrete paving. The scope also includes new sidewalk paving, sloped concrete paving,standard concrete paving, metal guardrail installation, ADA-compliant ramps, the construction of a retaining wall along a portion of the sidewalk, and the reconstruction of existing driveways to provide an ADA-compliant pedestrian path. https://www.civcastusa.com/project/69092401d9901be274fa536f/summary prico@gessnereng.com
PREBID
11/12/2025 8:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT