Access the Full Project by Clicking here!
Bidjugde
JOB
Minuteman Missile Access Road
BID DATE
12/16/25 - 12:00
AGENCY
Lakewood
ESTIMATE
n/a
SCOPE
The work includes roadway reconditioning and adding four inches of aggregate surface course. All proposed work is to stay on the existing roadway bench. The proposed typical section consists of reconditioning the existing gravel roadway per Section 303 and adding an additional 4-inches of Aggregate Surface Course with a maximum width of 24-feet. A 4% crown is proposed or as approved by the CO. The Contractor will need to taper down the proposed aggregate surface, per the typical section, at applicable locations. https://sam.gov/workspace/contract/opp/43ed7c2201de471694f96b5592c372bb/view cflacquisitions@dot.gov
UPDATES