Access the Full Project by Clicking here!
Bidjugde
JOB
North Lake Trail East Collins Altoona Rd Construction
BID DATE
12/11/25 - 1:00
AGENCY
Lake County
ESTIMATE
n/a
SCOPE
This project is in North Lake County, in the City of Umatilla and shall consist of constructing a multi-use trail along SR 19. Contractors shall bid to construct the multi-use trial from Station 12+00 to Station 42+50 as the base bid. Between Station 12+00 and 12+60 Lake County will connect to Hatfield Drive instead of the proposed connection to E. Collins Street (CR 450 East) as shown in the plans. Trail construction shall consist of stabilized subgrade under the concrete as well as asphalt, limerock, asphalt, installation of Reinforced Concrete Pipe and Miter End Sections, striping, signing, cast in place detectable warning mats, 4’ concrete separators, 6” concrete, sod, and other miscellaneous incidental construction. https://c.lakecountyfl.gov/offices/procurement_services/bid_details.aspx?bid_number=26-702&mylakefl=True gretchen.bechtel@lakecountyfl.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT