Access the Full Project by Clicking here!
Bidjugde
JOB
Ditch H Trail Sugarland Trail Phase 1
BID DATE
12/4/25 - 9:00
AGENCY
Sugar Land
ESTIMATE
n/a
SCOPE
The trail is generally located in central Sugar Land, adjacent to the Telfair District, running alongside the Ditch H Levee. This project consists of approximately 3.2 miles of 10-foot-wide multiuse trail, it generally extends from Imperial Park to Smart Financial Center. It crosses underneath Meadowcroft, HWY 6 and IH-69/59, with safety lighting hung underneath the overpasses. Ditch H/Sugarland Trail has 3 proposed pedestrian bridges, in which 2 of the bridges have pedestrian boardwalk structures. The project also includes approximately 11,050 SF of retaining wall with 2,950 LF of pedestrian railing. Trail includes one trailhead and multiple locations of wayfinding signage. The city would also like to explore options for installing glow stones, which will be seen in the bid item form under Alt 1, Alt 2, and Alt 3. https://www.civcastusa.com/project/68f8d825f1d8bb9eae32b3cd/summary bradley.bennett@westwoodps.com
PREBID
11/3/2025 12:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT