Access the Full Project by Clicking here!
Bidjugde
JOB
Hillside Terrace 24 Inch Waterline Relocation
BID DATE
12/2/25 - 12:00
AGENCY
Hays County
ESTIMATE
$774,000
SCOPE
Due to the Hillside Terrace roadway expansion, approximately 826 LF of Owner’s 24-inch ductile iron waterline will need to be relocated. The relocations include a proposed 126 LF of 36-inch steel casing pipe and 20 LF of 36-inch split steel casing and 80 LF trenchless install. The connection work shall be completed within 24 hours for the GBRA 24-inch pipeline as provided in the Sequence of Construction Notes on Sheet G1 of the Plans. Shutoff must occur during the low flow months of November to April. https://www.civcastusa.com/project/68ffd8c33f470da910542fab/summary purchasing@gbra.org
PREBID
11/10/2025 8:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT