Access the Full Project by Clicking here!
Bidjugde
JOB
Suwanee Creek Diversion Pump Station Expansion
BID DATE
12/16/25 - 1:00
AGENCY
Gwinnett County
ESTIMATE
n/a
SCOPE
Replacement of the six (6) existing pumps with six (6) new dry-pit submersible type pumps. Demolition of the existing chemical feed tank, system, and pumps and installation of a new chemical feed tank, system, and pumps. Demolition of the existing seal water system. Rehabilitation of the existing diversion structure. New electrical equipment (including variable frequency drives, control panels, switchboard, motor control centers, etc.) associated with the proposed installation Installation of an Owner-furnished programmable logic controller (PLC). Demolition and expansion into the footprint of the existing chemical room to house additional electrical equipment. Miscellaneous structural, architectural, and other modifications to accommodate the listed improvements. Brittany.Bryant@gwinnettcounty.com
UPDATES