Access the Full Project by Clicking here!
Bidjugde
JOB
Del Rio Sewer Force Main Rehabilitation
BID DATE
12/10/25 - 12:00
AGENCY
Sacramento
ESTIMATE
n/a
SCOPE
Rehabilitation will be performed using a water-cured, pressure-rated Cured-in-Place Pipe (CIPP) method, a custom epoxy liner system installed within the existing pipe. This is primarily a trenchless operation. However, specific excavation pits will be required to access the pipeline and facilitate liner installation. These areas will serve as designated work zones for staging CIPP equipment and performing the liner launching points. Additional reinforcement at liner termination points will be completed using carbon fiber wrap overlay. The scope of work includes, but is not limited to, temporary traffic control, dewatering, sheet piling, shoring and bracing, large diameter pipe CCTV inspection and cleaning, manhole rehabilitation, new manhole construction, FRPMP pipe closures, blowoff valve replacement, surface restoration, vehicle gate and fencing installation, etc. https://vendors.planetbids.com/portal/15300/bo/bo-detail/135288 Arvasquez@cityofsacramento.org
UPDATES