Access the Full Project by Clicking here!
Bidjugde
JOB
Idalia Road Reconstruction
BID DATE
10/14/15 - 10:00
AGENCY
Rio Rancho
ESTIMATE
$2,000,000
SCOPE
The City of Rio Rancho is soliciting formal bids for the reconstruction of Idalia Rd. from Iris Rd. to NM 528. The existing roadway pavement will be milled to 1.5” minus and stockpiled within 5 miles. The new roadway section is a 2 lane divided roadway with median including left turn lanes, bike lanes, curb and gutter, sidewalk, landscaping (additive alternate) and all appropriate signing and striping. Traffic signals will be installed at Camino Encantadas intersection, and permanent lighting will be installed at each intersection. Also, new access roads will be built parallel to Idalia, as bladed 2 lane dirt roads, to control direct access to Idalia Rd. Improvements also include an extensive storm drain system, which consists of inlets installed along Idalia Rd., a series of storm drain pipes ranging from 18” to 66” and improvements to the existing detention pond by the Judicial Complex. There is also an existing culvert crossing just east of Iris, which will be reconstructed. There are some utility improvements in this project consisting of water and sewer line extensions and stub outs.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT