Rfb 6685 Flour Bluff 18 Inch Water Line Extension
BID DATE
12/10/25 - 12:00
AGENCY
Corpus Christi
ESTIMATE
$6,600,000
SCOPE
The project scope of work includes the installation of 2.22 miles of 18-inch waterline from Don Patricio Drive and Flour Bluff Drive to Laguna Shores Road. The new 18-inch waterline will connect to the city’s existing 10” ACP waterline on Flour Bluff Drive and provide a stub out for a future 24-inch waterline connection. The 18-inch waterline will also connect to the city’s existing 18-inch waterline on Laguna Shores Road. Pipe installation will be by conventional trenching and guided auger bore. https://www.civcastusa.com/project/68f7f557a4f05922291c76a0/summary betsyr@corpuschristitx.gov
PREBID
11/5/2025 8:00