Access the Full Project by Clicking here!
Bidjugde
JOB
Fairview Park Cattail Removal
BID DATE
09/21/15 - 10:00
AGENCY
Costa Mesa
ESTIMATE
$40,000
SCOPE
Provide all the necessary manpower, tools equipment and materials to drain five ponds, remove vegetation and organic sediment, and install fill lines from existing reclaimed water mainlines; mobilization; and all other work as required. The contractor shall furnish all materials, tools, equipment and incidentals necessary to perform and complete the work as shown on the plans and these contract documents, and to the satisfaction of the Engineer.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT