Access the Full Project by Clicking here!
Bidjugde
JOB
Hubbard Drive Roadway Improvements
BID DATE
10/30/25 - 11:00
AGENCY
Heath
ESTIMATE
n/a
SCOPE
This project consists of removing and replacing 4,161 linear feet of full-depth pavement along Hubbard Drive and 350 linear feet of full-depth pavement along Larry Drive, street and driveway pavement removal and replacement along Hubbard Drive, 4,800 sf of concrete trail removal and replacement on Hubbard Drive, 700 linear feet of channel excavation, 3,064 linear feet of storm pipe and 400 linear feet of concrete box, 17 curb inlets along Hubbard Drive and Larry Drive, 1-6’x3’ box culvert, installing an additional 48-inch concrete pipe culvert crossing at Dunford Drive and associated headwalls, 1-16-inch inserta valve along Hubbard Drive, connections to the city’s existing 16-inch water line and extending 8-inch water service lines to properties on the North and South sides of Hubbard Drive, lowering 50 linear feet of 16-inch water line, raising 350 linear feet of 16-inch water line at Dunford Drive, associated traffic control, roadway striping, and erosion control. https://www.civcastusa.com/project/68ed4d0ebd1d922b3a058593/summary cslown@tnpinc.com
PREBID
10/21/2025 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT