RFPQ 25 48 900 East Storm Drain Phase 2
BID DATE
11/3/25 - 12:00
AGENCY
Murray
ESTIMATE
n/a
SCOPE
900 East Storm Drain Phase 2 includes over 3,200 feet of 42-inch and 36-inch RCP storm drain pipe installed in UDOT roadway (900 East) and Muray City roadway. The storm drain trunkline will be installed ten to thirteen feet deep in groundwater conditions (five to seven feet deep). Additionally, this project includes 15-inch, 18-inch, and 30-inch storm drain pipe, manholes, catch basins, asphalt restoration, and concrete replacement. https://utah.bonfirehub.com/opportunities/206681 tneely@murray.utah.gov