Sewer Rehab Pike Dakota 107th
BID DATE
11/12/25 - 12:00
AGENCY
Seattle
ESTIMATE
$2,712,000
SCOPE
This Project consists of the following elements of Work: Replacement of approximately 200 linear feet of sanitary sewer mainline pipe (ductile iron pipe (DIP) ranging from 8” to 12” in diameter) and 500 LF of storm drainage mainline pipe (ductile iron pipe (DIP) ranging from 6” to 12” in diameter). Additional elements of work include: traffic control, temporary sewer bypass, abandon existing sewer mainline pipes, assist SPU Water Crew with cut & cap of watermain pipe and temporary water service installation, electrical conduit & vault installation (E Pike St), post installation CCTV inspection, and surface restoration (pavement, stairs, landscaping, and ADA curb ramps). https://procurement.opengov.com/portal/seattle/projects/207406 kai.fan@seattle.gov nolan.godfrey@seattle.gov
PREBID
10/21/2025 7:00