Access the Full Project by Clicking here!
Bidjugde
JOB
River Road Booster Pump Station Waterline Interconnect
BID DATE
11/18/25 - 9:00
AGENCY
Cape Fear Public Utility Authority
ESTIMATE
n/a
SCOPE
Includes installing a booster station and water transmission main along River Road. The water booster station will be located on the western side of River Road and immediately north of Mott Creek. The 16” water transmission main will be located along River Road beginning at the southern side of Mott Creek where it will connect to a previously installed water main crossing of Mott Creek. The transmission main will continue south along River Road and connect to an existing 16-inch water main at Cathay Road and then terminate at the existing 12-inch water main at Halyburton Memorial Parkway to fill the existing Veterans Park Elevated Tank more efficiently. https://www.cfpua.org/bids.aspx?bidID=1215 bids@cfpua.org
UPDATES