Access the Full Project by Clicking here!
Bidjugde
JOB
2025 Asphalt Paving Parks Recreation Facility
BID DATE
11/14/25 - 11:30
AGENCY
Havelock
ESTIMATE
n/a
SCOPE
The asphalt paving to be completed at the Parks and Recreation facility shall be half of the existing walking path and paving around the concession stand. The total lineal footage of the walking path is approximately 5,300 lineal feet. The first area to be paved shall be line item #1 and shall be approximately half of the walking path at approximately 2,321 lineal feet with two options for width. The first width option shall be 6’ wide, the second width option shall be 8’ wide. See figure 2 for the area of the walking path to be paved. https://vrapp.vendorregistry.com/Bids/View/Bid/b31123a7-5899-4a7b-b2cb-7be68c29cef1 Bids@havelocknc.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT