Access the Full Project by Clicking here!
Bidjugde
JOB
UT FLAP WEB 10 1 Causey Reservoir Access
BID DATE
11/18/25 - 2:00
AGENCY
Department Transportation
ESTIMATE
n/a
SCOPE
Three-way intersection improvements: Causey Road will be realigned to change the through movement traffic pattern to Causey Dam Overlook Road instead of Wheat Grass Canyon Road. This realignment would improve the sight distance, promote travel across the dam, and produce on-site material. Wheat Grass Canyon Road: Proposed improvements for the first 0.46-miles will provide a 22-foot width through the paved areas and 5 (five) mechanically stabilized earth (MSE) walls (ranging from 9 to 19 feet tall) are required to provide a full two-lane roadway width at locations of severe outboard slope erosion. The proposed improvements will enhance driver safety, expectations, and ride quality by addressing existing conditions where the roadway transitions from two lanes to one and where pavement and aggregate surfaces vary. https://sam.gov/workspace/contract/opp/f1ba460ea9744ae6920029e46a0a6758/view cflacquisitions@dot.gov cflcontracts@dot.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT