Access the Full Project by Clicking here!
Bidjugde
JOB
District 2 Stewart St Fairview Dr Pavement Preservation
BID DATE
11/6/25 - 1:00
AGENCY
Carson
ESTIMATE
$933,260
SCOPE
The Stewart Street project includes, but is not limited to, application of Type 3 Modified rapid setting slurry seal; asphaltic concrete pavement patching, replacement, and mill and overlay; construction of sidewalk, valley gutter, curb and gutter, and ADA ramps; installation of AC-powered RRFB assemblies and luminaire; and signing and striping improvements. The limits of construction are along Stewart Street from Little Lane to E. William St. The Fairview Drive project includes, but is not limited to, placing Type 3 Modified rapid setting slurry seal, pavement patching, and restriping of Fairview Drive from Roop Street east to the bridge approach slab at the I-580 underpass. cakers@carson.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT