Access the Full Project by Clicking here!
Bidjugde
JOB
26 008 RFP Marion Pugh Rehabilitation Holleman Dr George Bush Dr
BID DATE
10/29/25 - 11:00
AGENCY
College Station
ESTIMATE
n/a
SCOPE
This project consists of the rehabilitation and reconstruction of Marion Pugh Drive from George Bush Drive to Holleman Drive. The roadway rehabilitation project will generally include removal of existing asphalt pavement, constructing 10” jointed reinforced concrete pavement with curbs including subgrade, constructing a storm sewer system, water line system, and sanitary sewer work. Installing striping and signage, TCP, SW3P, block-sodding disturbed areas, and all other related work associated to the project as shown on the plans and specifications. https://brazosbid.ionwave.net/PublicDetail.aspx?bidID=3439&SourceType=1&sort=CloseDate%7eD
UPDATES