Access the Full Project by Clicking here!
Bidjugde
JOB
Golden Avenue Bridge Replacement No BRLS 5269 025
BID DATE
10/16/25 - 7:00
AGENCY
Placentia
ESTIMATE
$4,400,000
SCOPE
The City of Placentia invites sealed bids for a project to improve Golden Avenue Bridge and the related portion of the OC Bikeway Loop Segment D. Golden Avenue is a regionally significant collector roadway, providing east west travel between the cities of Placentia and Yorba Linda. The Golden Avenue roadway east and west of the bridge crossing currently provides one lane of travel in each direction with a center two way left turn lane. At the current bridge crossing the lane configuration is reduced to one lane in each direction with no center lane, sidewalks or bike lanes. The project would replace the existing bridge with a new two-lane bridge that would include sidewalk, a striped median center, bike lanes, hand railing and all related grading, drainage, utility, roadway improvements and such other items or details, not mentioned above, that are required to complete the project. The bridge will be widened from approximately 27’ to 60’-4” and would have a similar roadway profile as the existing bridge. The existing bridge structure will be removed to be replaced with two new abutments. OC Bike Loop Segment D is an approximately 1.1-mile paved Class I bikeway between the cities of Brea and Placentia. Construction will be recently completed on a majority of the segment D alignment when the bridge project begins, with the remaining portion to be completed as a part of this project. https://vendors.planetbids.com/portal/54600/bo/bo-detail/133980 gguerrero-gabany@placentia.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT