New Water Installations
BID DATE
10/10/25 - 11:00
AGENCY
Habitat Humanity
ESTIMATE
$700,000
SCOPE
The estimated run length from the city water main to the back of the sidewalk is approximately 15 feet. oTap 1" water lateral into the city 12" main water service. o Furnish and install a #2 concrete water box with a lid. o Set the water box and curb stop/shutoff valve 1 foot behind the back of the sidewalk. o Remove and replace one 4-foot sidewalk panel with integrated curb and gutter as necessary to accommodate the new lateral water service. o Perform asphalt patching and apply a crack sealant at the affected area to restore surface integrity. kristen@habitatcaz.org