Access the Full Project by Clicking here!
Bidjugde
JOB
FY26 CDBG Sidewalk Curb Ramp
BID DATE
10/9/25 - 10:30
AGENCY
Gilroy
ESTIMATE
n/a
SCOPE
The work includes the furnishing of all labor, materials, equipment, and incidentals necessary to perform the design of new curb ramps and the demolition and/or construction of new curb ramps, driveway approaches, curb and gutter, and sidewalks. The work also includes storm drainage improvements, tree and tree stump removal, tree installation, minor asphalt concrete replacement, pavement striping, curb markings, stormwater management, and other incidentals thereto, in various locations in the City of Gilroy, as outlined in these plans and specifications. https://www.cityofgilroy.org/bids.aspx?bidID=164 Specs: https://www.cityofgilroy.org/DocumentCenter/View/16794/26-PW-303-Final-Specifications?bidId=164

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT