Access the Full Project by Clicking here!
Bidjugde
JOB
Cortez Drive Bridge Boulevard Improvements RFB 12-26-DC
BID DATE
10/14/25 - 11:00
AGENCY
Bernalillo County
ESTIMATE
n/a
SCOPE
Remove the Bridge Boulevard westbound slip lane. Revise the existing southbound connect lane (connects Tower Road and Bridge Boulevard) from a one-way southbound lane to a two-way travel lane, including impacted drainage and signing. The addition of a deceleration lane along westbound Tower Road (adjacent to pocket park) to accommodate northbound access to the revised southbound connect lane. Revise the Bridge Boulevard/Cortez Drive intersection to include a raised median to reduce vehicular and large truck traffic along Cortez Drive. Install a dedicated left turn along Bridge Boulevard in front of Catholic Charities. https://bernco.bonfirehub.com/opportunities/198706 dconkle@bernco.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT