Murray Pump Station East Force Main Rehabilitation Phase 2
BID DATE
11/3/25 - 11:30
AGENCY
King County - WA
ESTIMATE
n/a
SCOPE
The purpose of this project is to rehabilitate the east force main of the Murray Pump Station, approximately 350 feet of 27-inch bar-wrapped concrete cylinder pipe (CCP) and install two vacuum relief valve assemblies. The work includes but is not limited to installation of a below grade precast concrete structure to house the relief valve assembly, installation of a 2nd assembly within the Murray Pump Station equipment room, sewer diversion to the west force main during rehabilitation, and restoration of concrete panels along Beach Dr SW, and all other work required in the Contract documents. https://fa-epvh-saasfaprod1.fa.ocs.oraclecloud.com/fscmUI/faces/NegotiationAbstracts?prcBuId=300000001727151&_adf.ctrl-state=vbnqw5zc8_1&_afrLoop=46061132771288551&_afrWindowMode=0&_afrWindowId=&j3xbor=1759391873.552d3d3LmJ4d2EuY29t1025028d90e10f0b02ecf32ed6d4abbc26e4a268de308186d23&_afrFS=16&_afrMT=screen&_afrMFW=1594&_afrMFH=1045&_afrMFDW=1536&_afrMFDH=960&_afrMFC=8&_afrMFCI=0&_afrMFM=0&_afrMFR=96&_afrMFG=0&_afrMFS=0&_afrMFO=0 lsnyder@kingcounty.gov
UPDATES