Access the Full Project by Clicking here!
Bidjugde
JOB
CDBG MIT Construction Services King Baker Drainage System Replacement
BID DATE
11/12/25 - 12:00
AGENCY
DeSoto
ESTIMATE
n/a
SCOPE
The project involves mitigations efforts to overhaul the current decaying King and Baker Drainage System and renew it with a system designed with a longer service life. The existing system includes approximately 3,700 linear feet of 66-inch corrugated metal drainage main line piping, inlet structures and connections of smaller drainage pipes. Two alternatives are proposed for this project: a cured in place pipelining approach and a replacement using reinforced concrete pipe. Contractors may bid one or both alternatives. https://www.demandstar.com/app/limited/bids/509521/details
UPDATES