Access the Full Project by Clicking here!
Bidjugde
JOB
Mrud Storm Sewer Phase 1 Rehabilitation
BID DATE
10/7/25 - 10:00
AGENCY
Malcomson Road Utility District
ESTIMATE
n/a
SCOPE
1-Rehabilitation of 24-inch storm sewer outfalls with CIPP. 2-Rehabilitation of 48-inch and 60-inch storm sewer outfalls with mortar-based spray applied liner. 3-Locating and raising a manhole to 1 inch above existing natural ground. 4-Site restoration of all areas disturbed by construction, including removing and replacing damaged concrete, sidewalks, and collars on storm sewer outfalls, repair of existing slope paving, pilot channel, and rip rap, regrading of detention pond, crushed granite trail, asphalt trail, turf, plants, shrubs, fences, and trees in kind; sodding and hydro mulching, as required, and site cleanup. https://www.civcastusa.com/project/68cc851b2c8ff14dcce87e7f/summary LMBoehler@LAN-inc.com
PREBID
9/30/2025 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT