Access the Full Project by Clicking here!
Bidjugde
JOB
Garner Avenue Bus Bulb Out CIP No 9503
BID DATE
10/14/25 - 11:00
AGENCY
Salinas
ESTIMATE
n/a
SCOPE
In general, the work shall include, but is not limited to the removal of existing concrete sidewalk, curb and gutter, asphalt concrete pavement, storm drain pipe, signage, and existing pavement markings. The work also includes the construction and installation of new concrete curb and gutter, concrete sidewalk, concrete ADA curb ramps, installation of new HDPE storm drain pipe, storm drain catch basin, storm drain manhole, application of 6” and 12” type A hot mix asphalt, installation of street signs, pavement markings, curb markings, and all incidental and appurtenant improvements and restorations specified on the Plans and herein these Special Provisions. https://vendors.planetbids.com/portal/22949/bo/bo-detail/133759 jonathanh@ci.salinas.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT