Access the Full Project by Clicking here!
Bidjugde
JOB
SR202 Shared Use Trail Extension
BID DATE
10/15/25 - 8:00
AGENCY
North Bend
ESTIMATE
$6,395,000
SCOPE
Schedule A – Shared-Use Trail: This work includes the construction of a shared-use trail and pedestrian facilities on the north side of State Route 202 (Bendigo Boulevard North) extending from Boalch Avenue NE to the City’s Wastewater Treatment Facility (WWTF), approximately 2,360 feet. Included in this work is the construction of an elevated boardwalk, concrete abutments and pedestrian bridge over South Fork Snoqualmie River, structural earth embankments, asphalt paved trail, three separate gravel access roads, pedestrian level lighting, wetland and stream mitigation planting, and surface restoration. Schedule B – WWTF Frontage Improvements: This work includes the construction of frontage improvements along State Route 202 (Bendigo Boulevard North) extending from the shared-use trail to Sydney Avenue, approximately 420 feet. Included in this work is the construction of concrete curbs, gutters and sidewalks, storm drainage improvements, pedestrian level street lighting and surface restoration. Schedule C - Sanitary Sewer ULID No. 7: This work includes the construction of approximately 210 linear feet of 8-inch HDPE sewer force main, approximately 260 linear feet of 8-inch ductile iron sewer force main across the new pedestrian bridge, approximately 570 linear feet of 12-inch PVC gravity sewer main, manholes, modifications to an existing manhole, and connections to the existing system. http://bxwa.com/bxwa_toc/pub/3418/nb26_sr202_shared_use_project_63396/info.php tmohr@northbendwa.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT