Access the Full Project by Clicking here!
Bidjugde
JOB
Yuba Avenue Drainage Diversion
BID DATE
09/10/15 - 2:00
AGENCY
San Pablo
ESTIMATE
n/a
SCOPE
Diversion of stormwater runoff from the existing concrete valley gutter by trenching an underground stormdrain system, which includes installation of an 18” RCP pipe and three catch basin inlets, removal and replacement of curb and gutter and sidewalks, that will daylight onto a downstream street gutter. Installation and maintenance of required erosion control measures and required traffic control measures during the project construction period are also included.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT