Access the Full Project by Clicking here!
Bidjugde
JOB
2025 Combined Cured In Place Rehabilitation
BID DATE
10/7/25 - 11:00
AGENCY
Edmonds
ESTIMATE
$1,600,000
SCOPE
Construction of the 2025 Combined Cured in Place Pipe (CIPP) Rehabilitation Project and the furnishing of all labor, materials, and equipment necessary for this project. The project covered by these specifications and bid documents involves six schedules (A - Sewer, B - Sewer, C - Sewer, D - Sewer, E – Sewer Bid Alternate, and F - Stormwater) in the construction of the City of Edmonds Phase 12 Sewer and Phase 5 Stormwater Replacement and Rehabilitation Project. This project consists of: • Phase 12 Sewer (Schedules A – E) Installation of approximately 180 linear feet (LF) of 6-inch diameter cured-in-place pipe (CIPP) structural liner, 3800 LF of 8-inch diameter CIPP structural liner, and 280 LF of 21-inch diameter CIPP structural liner, along with both pre-construction and post-construction CCTV pipe inspection. • Phase 5 Stormwater (Schedule F) Installation of approximately 910 LF of 24-inch diameter CIPP structural liner, along with preconstruction and post-construction CCTV pipe inspection. http://bxwa.com/bxwa_toc/pub/2225/edm40_2025_combined_cured_in_p_53695/info.php greg.malowicki@edmondswa.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT