Wastewater Lift Station Equipment Upgrades Phase 2
BID DATE
10/2/25 - 8:00
AGENCY
Redmond
ESTIMATE
$2,969,594
SCOPE
Replacement of equipment at four (4) existing wastewater lift stations, referred to as Wastewater Lift Stations 17, 51, 52, and 53. This includes but is not limited to: Removal and replacement of pumping equipment, piping, valves, and appurtenances within existing dry wells/lift stations; installation and operation of temporary bypass pumping; removal of existing seal water systems; removal and replacement of the WWLS 51 above ground fuel storage tank; and modifications to the electrical and control systems related to the equipment replacement. https://www.redmond.gov/bids.aspx?bidID=312 mhaley@redmond.gov