Access the Full Project by Clicking here!
Bidjugde
JOB
22nd Street Revitalization Addressing Safety Equity Connectivity
BID DATE
11/4/25 - 12:00 LIVE!
AGENCY
Tucson
ESTIMATE
$137,438,010
SCOPE
The work consists of reconstructing 22nd Street from Kino Parkway to Tucson Boulevard and replacing the existing 4-lane 22nd Street bridge that runs over Barraza-Aviation Parkway and the Union Pacific Railroad (UPRR) with a new 6-lane facility. The facility will consist of two 3-lane bridges with a protected eight-foot multiuse path, one for the eastbound travel direction and one for the westbound travel direction. In addition to the bridge components, improvements shall consist of cast-in-place retaining walls; asphaltic concrete and Portland cement concrete paving, concrete curb/curb and gutter, concrete barrier and sidewalk, paved pathways; a drainage channel, pipe culverts, storm drains, manholes, catch basins and associated inlet and outlet structures; street lighting; landscaping and irrigation; pavement marking and signing; traffic signal improvements at the Tucson Boulevard intersection and Barraza-Aviation Pkwy/Ramp B; sewer modifications; water modifications, and other incidental work. maritza.felix@tucsonaz.gov LIVE: https://teams.microsoft.com/meet/2716061882908?p=xp0GTgV2fC6stEPVfY https://procurement.opengov.com/portal/tucson-az/projects/140011
UPDATES