2025 Heron Pointe Waggener Farm Park Drainage
BID DATE
09/29/25 - 10:00
AGENCY
Berthoud
ESTIMATE
n/a
SCOPE
The 2025 Heron Pointe and Waggener Farm Drainage Project consists of two separate task items: Item A – Heron Pointe Drainage Improvements, and Item B – Waggener Farm Park Detention Basin Improvements. These will require excavation and regrading of existing drainage facilities, and installation of concrete channels per construction drawings. Additional drainage devices are detailed within the construction documents. This will require some work adjacent to active roadways. https://www.bidnetdirect.com/colorado/solicitations/open-bids/2025-Heron-Pointe-and-Waggener-Farm-Park-Drainage-Project/0000397888?purchasingGroupId=8409951&origin=2 dbuendia@berthoud.org