Access the Full Project by Clicking here!
Bidjugde
JOB
Citywide Culvert Headwall Improvement Phase VII
BID DATE
10/15/25 - 12:00
AGENCY
Tamarac
ESTIMATE
n/a
SCOPE
The proposed project sites (3 locations) include the following: Location No. 1 – NW 70th Avenue, north of NW 80th Court; Location No. 2 – NW 79th Avenue, south of NW 60th Street (East and West Side); and Location No. 3 – Westwood Drive, north of NW 74th Court (East Side). Refer to Exhibits 1-3, Location Maps for the referenced locations. The work shall include, but not be limited to, demolition of existing headwalls, the construction of new aluminum sheet piling headwall and/or riprap installation, improvements to existing drainage system, asphaltic concrete pavement restoration, striping, concrete sidewalk and curb replacement, guardrail restoration, earthwork and landscape restoration improvements.
UPDATES