Access the Full Project by Clicking here!
Bidjugde
JOB
Franklin County 2025 Roads Resurfacing
BID DATE
10/14/25 - 1:00
AGENCY
Franklin County
ESTIMATE
n/a
SCOPE
The project involves reclaiming and resurfacing approximately 0.263 miles of Shuler Street and State Street located in Eastpoint, resurfacing approximately 0.227 miles of Begonia Street located in Eastpoint, resurfacing approximately 0.107 miles of 7th Street located in Eastpoint, resurfacing approximately 0.136 miles of 8th Street located in Eastpoint, reclaiming and resurfacing approximately 0.190 miles of Cypress Lane located in Eastpoint, reclaiming and resurfacing approximately 0.326 miles of Bear Creek Road located in Eastpoint, reclaiming and resurfacing approximately 0.141 miles of Beacon Street located in Carrabelle, reclaiming and resurfacing approximately 0.163 miles of Frank Mckamey Way located in Carrabelle and the replacement of an existing pipe at the intersection of 15th Street and Avenue M located in Apalachicola. srenfro@dewberry.com. Jstephens@dewberry.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT