Access the Full Project by Clicking here!
Bidjugde
JOB
Stormwater Storm Drainage Infrastructure Improvements
BID DATE
11/4/25 - 12:30
AGENCY
Four Oaks
ESTIMATE
n/a
SCOPE
The overall project consists of the construction of various upgrades to existing storm drainage systems, culverts and ditches for a major trunk line system in downtown residential and commercial areas (“Downtown Storm Trunkline Improvements”) and a smaller upgrade to an existing culvert on Massengill Street (“Massengill Street Culvert Improvements”). For this particular “CONTRACT 1”, the work consists of approximately 1,365 LF of multiple storm pipe system upgrades and replacement for 3 separate trunkline systems along South Baker Street, north of US 301, and along North Baker Street; approximately 420 LF of multiple storm pipe system upgrades and replacement for 2 separate spur lines along Sanders Street and North Baker Street; and approximately 810 LF of ditch and side slope improvements along 3 separate drainage ditches. (Other portions of work identified on the plans and in the Bid Documents have been separated out for a future Contract 2).

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT