Access the Full Project by Clicking here!
Bidjugde
JOB
Concrete Improvements
BID DATE
09/24/25 - 8:00
AGENCY
El Segundo
ESTIMATE
n/a
SCOPE
Construction activities will include: Demolition and removals of existing concrete and asphalt. Root removal and grading as needed. Repair of existing concrete sidewalk, curb, or curb and gutter. Removal and replacement of existing driveway approaches and alley approaches. Installation of new ADA-compliant curb ramps, including yellow truncated domes. Full-depth (6” asphalt over 6” base) pavement rehabilitation for a portion of an existing alley. Adjustment of fire hydrant, sewer manhole, and utility cover elevations to grade. Installation of full-depth 3-foot-wide asphalt slot paving Relocation of traffic signage as needed. Replacement of any damaged striping or pavement markings as needed. https://www.elsegundo.org/Home/Components/RFP/RFP/229/268895 purchasing@elsegundo.org
PREBID
9/16/2025 6:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT