Access the Full Project by Clicking here!
Bidjugde
JOB
SH 138 24 Water Transmission Main
BID DATE
10/2/25 - 11:00
AGENCY
Georgetown
ESTIMATE
n/a
SCOPE
The SH 138 – 24” Water Transmission Main project consists of a 24” diameter ductile iron water transmission pipeline and connections to existing 3”, 6”, 12”, and 18” water lines (length = 28,805 linear feet). The pipeline extends from Hoover GST south of SH 138 on CR 223 to SH 138 at SH 195. Work includes site preparation installation of 24” ductile iron restrained and unrestrained pipeline, 3”, 6”, 12”, and 18” PVC restrained and unrestrained pipeline, appurtenances, valves, fire hydrant, borings, steel casings, fence and gate removal and replacement, pavement restoration, tree removal, clearing, site restoration, miscellaneous items more fully described in the Drawings and Specifications https://gtowntx.ionwave.net/PublicDetail.aspx?bidID=2248&SourceType=1 nicole.abrego@georgetowntexas.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT