Parker Road Sidewalks East Side Gaps Pine Drive Stroh Road
BID DATE
09/4/25 - 8:00
AGENCY
Greeley
ESTIMATE
n/a
SCOPE
The project consists of constructing a 10-foot-wide concrete shared use path along the east side of Parker Road between Pine Drive and Stroh Road in two different segments. Curb ramps will be upgraded to be ADA compliant when within the work area. Retaining walls, two prefabricated steel pedestrian bridges, and other drainage structures will be required in various locations. https://www.bidnetdirect.com/colorado/town-of-parker/solicitations/Parker-Road-Sidewalks-East-Side-Gaps-Pine-Drive-to-Stroh-Road/0000395557?purchasingGroupId=8409951&origin=2 tgill@parkeronline.org