BL113-25 Wayne Mason Raw Water Intake Improvements
BID DATE
11/21/25 - 1:00
AGENCY
Gwinnett County
ESTIMATE
n/a
SCOPE
"The project involves the removal of the existing intake pipes, check valves, and butterfly valves at the Wayne Mason Raw Water Intake site. New Check valves, butterfly valves and a freight lift with enclosure will be installed. The contractor will install two new intake pipes with tee screens at elevations of 1,025 and 1,042.5ft in the lake. A concrete meter vault will be installed at the site, and a new flow meter will be provided by the Owner for installation on the 78-inch raw water transmission line. The project also involves the coring of a new wet well penetration for the pipe at elevation of 1,042.5 ft. Site modifications will improve access, mobility, security, and stormwater management. Donna.Henley@Jacobs.com "