Access the Full Project by Clicking here!
Bidjugde
JOB
UIC Retrofits Package 3 Rosewood Pilkington
BID DATE
09/25/25 - 11:00
AGENCY
Lake Oswego
ESTIMATE
$185,000
SCOPE
There are three areas of work in close proximity for this project – Rosewood St, Hunter Ct, and Pilkington Rd. Rosewood St and Hunter Ct are local roads whereas Pilkington is a major collector but can get busier from school traffic. The work consists of 1) replacing a perforated pipe with a ductile iron pipe along Rosewood St, replacement of a catchbasin and a tree removal/replacement, 2) replacement of a catch basin on Hunter Ct, and 3) decommission of a drywell on Pilkington along with removal of a catch basin, abandonment of pipes, and installing a new line from a manhole on private property to the mainline in Pilkington. https://www.ci.oswego.or.us/bids/rfp/uic-retrofits-package-3-rosewoodpilkington
PREBID
9/10/2025 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT