Pavement Management Utility Upgrades NE 24th Street
BID DATE
09/25/25 - 8:00
AGENCY
Redmond
ESTIMATE
$10,200,000
SCOPE
The Work to be performed shall include: Construction of approximately 6,200 feet of water pipe (4"-12" in diameter), 2,100 feet of sanitary sewer pipe (6"-10" in diameter), and 600 feet of storm pipe (12" in diameter); repaving and restriping of approximately 3 lane-miles of roadway; and upgrade to existing curb ramps to meet ADA standards. Work includes, but not limited to, installation of piping, fire hydrants, water meters, manholes, catch basins, side sewers, sidewalks, curb ramps, paving, and other work necessary to complete the project. http://bxwa.com/bxwa_toc/pub/1749/red75_pavement_management_amp_34028/info.php mhaley@redmond.gov