San Jose Blvd Road Improvements Phase III B
BID DATE
09/11/15 - 10:00
AGENCY
Carlsbad-NM
ESTIMATE
n/a
SCOPE
Roadway and enhancement improvements on San Jose Blvd. from Del Rio Street to Peach Tree Street including roadway, sidewalks, drainage, lighting, curb and gutter. The project will include a 3-lane roadway with 2 travel lanes, bicycle lanes, and a center left turn lane from BOP to EOP. New curb and gutter and sidewalk will be installed on both sides of the roadway. Improvements will also include: installing underground storm drain with curb inlets, and reconstructing several intersections. Contractor will be responsible for acquiring all permitting, SWPPP, and erosion control.