Access the Full Project by Clicking here!
Bidjugde
JOB
Sweet Springs Community Mobile Home Park
BID DATE
09/17/25 - 7:00
AGENCY
Sweet Springs Community MHP
ESTIMATE
n/a
SCOPE
The project will consist of two phases of work. Phase 1 is comprised of replacing the distribution system, and Phase 2 is comprised of installing a new booster and providing additional storage. The water system will be required to provide service to the customers throughout both construction phases. It is expected that a switch-over will occur within a single day, once both phases of construction are approved. Phase 1 construction activities will include replacing all distribution lines with 3,688 lineal feet of 4-inch C-900 PVC pipe, 109 lineal feet of 4-inch ductile iron pipe, 20 each 4-inch valves, 6 each 2-inch post fire hydrants, 1 each blow off assembly, and appurtenant bends and service connections. Phase 2 will include connecting two 10,000 gallon plastic storage tanks to the existing welded steel tank, adding a new 3 HP booster pump with pressure switch & re-locating the 3 each bladder tanks on a concrete pad, installing a new electric rack, and connecting the electric to the existing electric sub-panel. Russell and Beth Chambers at sweetspringsmhp@gmail.com
PREBID
9/5/2025 7:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT