(CMAR) Deer Valley Treatment Plant Aquifer Storage Recovery
BID DATE
09/18/15 - 5:00
AGENCY
Phoenix
ESTIMATE
$2,600,000
SCOPE
Components of the ASR Facility will include: ï‚· Pump, column pipe/tube assembly, and motor for the well; ï‚· Piping to existing chlorine system; ï‚· Source line connection to well; ï‚· Piping to waste and to existing reservoir; ï‚· Dechlorination system; ï‚· Ancillary equipment related to the well (flow-meter, pressure sustaining valve, bypass valve, and pressure transducer); ï‚· Real-time nitrate analyzer components; ï‚· Instrumentation, programming, and connections to Supervisory Control and Data Acquisition (SCADA/DCS) system to fully automate the well; ï‚· Electrical power feed and gear for all new equipment; and ï‚· Equipping a compliance monitor well.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT