Access the Full Project by Clicking here!
Bidjugde
JOB
Hulett Street Kilmer Drive Ditch Drainage Improvements
BID DATE
10/1/25 - 10:00
AGENCY
Pine Forest
ESTIMATE
$600,000
SCOPE
- 4500 LF of Roadside Ditch Improvement To improve drainage at Hulett Street and Kilmer Drive, the existing ditches will be regraded to enhance flow toward the designated outfall. In addition to regrading, several culverts will need to be replaced. The depth and width of the ditches will vary based on the required slope needed to maintain proper flow. The construction staging area will be located as close as possible to the work site, depending on available easements, street right-of-way, and city-owned property. No historical or archaeological impacts are anticipated in the project area. https://www.civcastusa.com/project/68a4a5cedfd648f37d6b4a2d/summary aelefano@fittzshipman.com
PREBID
9/3/2025 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT