Access the Full Project by Clicking here!
Bidjugde
JOB
South Penelope North Main Street Industrial Park Road Sidewalk Improvements Belton
BID DATE
09/30/25 - 7:00
AGENCY
Belton
ESTIMATE
n/a
SCOPE
For South Penelope Street, the project includes, but is not limited to, protection of items to remain, the demolition of existing asphalt and concrete paving. The scope also includes new sidewalk paving, installation of concrete curb and gutter, ADA-compliant ramps, and handrails. The utility scope includes adjustments to water meter vaults, cleanouts, and other utility structures to match the proposed sidewalk grade. The storm sewer scope involves connecting existing downspouts to a new underground collection pipe that ties into the existing drainage system. The project also includes sidewalk closures and pedestrian access phasing plans. Add alternates include replacing portions of the proposed sidewalk with decorative sidewalk pavers and installing underground electrical conduit for Oncor. For Main Street, this project includes, but is not limited to, protection of items to remain, the demolition of existing asphalt and concrete paving. The scope also includes new sidewalk paving, sloped concrete paving,standard concrete paving, metal guardrail installation, ADA-compliant ramps, the construction of a retaining wall along a portion of the sidewalk, and the reconstruction of existing driveways to provide an ADA-compliant pedestrian path. Main Street is a Texas Department of transportation roadway. All traffic control is to be per the project details and TxDOT standards. The contractor shall obtain the ROW permit through the TxDOT RULIS system. https://www.civcastusa.com/project/68a37dd7e258105242bcc509/summary prico@gessnereng.com
PREBID
9/11/2025 7:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT