Access the Full Project by Clicking here!
Bidjugde
JOB
Brushy Creek Waterline Replacement
BID DATE
09/23/25 - 9:00
AGENCY
Onalaska Water Supply
ESTIMATE
n/a
SCOPE
• Directional bore and installation of approximately 4,300 L/F of 8” HDPE pipe SDR 11 or SDR 9 T.B.D. to Vering depths of 6’- 20’ +. • Provide all equipment and certified personnel necessary to fuse pipe to manufacture specifications. • Install HDPE restraint fittings, valves, and tracer wire per OWSC specifications. • Make tie ins to existing 6” watermain. • Provide pressure testing to industry standards prior to and after pipe installation. https://www.civcastusa.com/project/68a72be008bbfc499e624f72/summary Connie@onalaskawaterandgas.com
PREBID
9/11/2025 7:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT