Access the Full Project by Clicking here!
Bidjugde
JOB
Gladewater Sh 271 Lift Station Relocation
BID DATE
09/10/25 - 11:00
AGENCY
Gladewater
ESTIMATE
$1,198,955
SCOPE
The demolition of the existing Tyler Lift Station and construction of a new lift station of the same size and capacity outside of TxDOT ROW. Project also includes the removal or abandonment of the existing 6” gravity sewer lines and manholes that discharge into the lift station, as well as a small portion of the existing 4” force main. Approximately 1095 LF of new 6” gravity sewer main, 120 LF of new 4” force main, and 7 new manholes will be constructed within 10 feet of the new TxDOT ROW line. https://www.civcastusa.com/project/688b8370b6e7a87c7b08c8d8/summary lcrossman@spi-eng.com