Access the Full Project by Clicking here!
Bidjugde
JOB
2015 Valve and Piping Improvements
BID DATE
08/19/15 - 2:00
AGENCY
Windsor
ESTIMATE
$109,000
SCOPE
The work on the 2015 Valve and Piping Improvements involves construction at three general locations in the treatment plant. Improvements at one location include installation of a 14-inch plug valve with pneumatic actuator in an existing vault, provision and installation of a new vault cover, installation of two buried plug valves and relocation of an existing air receiver tank. Valves will be Town supplied. The installation of the valves will require coordination with Town staff for a pump around of influent sewage. At a second location, the project involves the supply and installation of slide gates in an existing concrete structure. At a third location the work involves the excavation and removal of an existing 30-inch tee and butterfly valve and replacement with new fittings and appurtenances that allow for pipe access. Additionally, the third location involves the installation of a 24-inch pipe cleanout.
PREBID
8/11/2015 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT